What`s the Typical Lead Time for a High-End Garden Room?
Investing in a high-end garden room is an exciting decision that can transform your property. Whether you're creating a peaceful home office, a gym, a hobby studio, or extra guest accommodation, a luxury garden room offers functionality, value, and style. But one of the first questions most homeowners ask is: How long will it take to install? The answer depends on several factors, including time of year, customisation levels, manufacturing backlogs, and the builder’s process. In this guide, we’ll break down what you can realistically expect when it comes to lead times for a high-end garden room—and why the process shouldn’t be rushed.
Why Lead Time Matters When Planning a Garden Room
A garden room project involves multiple steps: design, planning, site inspection, manufacturing, scheduling, and installation. If you’re planning around holidays, a new work-from-home schedule, or simply want to enjoy your new space by a specific date, understanding lead times is crucial. Lead time affects your schedule, your budget, and your overall satisfaction with the project. Rushing the process or choosing a company without proper planning can lead to delays, miscommunication, or even costly errors.
Oeco Garden Rooms: Typical Lead Times Explained
At Oeco Garden Rooms, our lead times typically range between 4 to 6 weeks from the time you place an order. This timeframe ensures every project is approached with care, from planning through to execution. During summer months, when demand is at its highest, our average lead time is around 6 weeks. In the winter months, with fewer projects underway, the lead time usually shortens to around 4 weeks. This allows us to optimise installation schedules while ensuring each client gets our full attention.
What Happens After You Place an Order?
Unlike many providers who demand deposits before inspecting your site, Oeco follows a more client-friendly model. After you place an order, our site surveyor will carry out a full survey before any deposit is taken. This means you're not financially committed until you're confident the build is viable for your space and specific needs. This site survey typically takes place within a few days of order placement, depending on location and access. It allows us to assess ground conditions, access logistics, boundary restrictions, service routing (for electrics, water, or data), and compliance with permitted development.
Why Seasonal Demand Affects Lead Time
The garden room market experiences seasonal shifts. Spring and summer months are peak times, as people prepare their homes for entertaining, working outdoors, or creating new living areas. During these months, lead times tend to extend slightly as demand increases. Conversely, autumn and winter are quieter periods. Fewer orders are placed, which means shorter lead times and more flexibility in scheduling. This makes winter an ideal time to place an order if you're aiming for a faster turnaround—or to have your garden room ready for spring.
What Can Delay a Garden Room Installation?
Even with a 4–6 week lead time, certain factors can delay or extend your garden room timeline. Some common causes include:
-
Planning Permission: While most garden rooms fall under permitted development, if your design exceeds height, usage, or boundary limits, you may need to apply for full planning consent, which can take 8–12 weeks.
-
Site Access Issues: If your garden is difficult to reach, located on a slope, or has poor ground conditions, groundwork might take longer to prepare.
-
Custom Design Requirements: Bespoke layouts, luxury finishes, integrated plumbing or complex electrics may extend manufacturing or fitting time.
-
Third-party Delays: If you're coordinating your own contractors (e.g., for landscaping or plumbing), misalignment in their schedules could affect completion.
-
Weather Conditions: While we work in most conditions, extreme weather—especially snow or heavy rain—can delay foundations or external cladding work.
Timeline Breakdown: From Order to Completion
Here’s a general outline of what to expect once you’ve decided to proceed with your Oeco Garden Room:
Week 0: Order Placed
You choose your design, finishes, layout and optional extras (e.g., soundproofing, heating, lighting). A site survey is scheduled.
Week 1: Site Survey Conducted
Our professional surveyor visits your site to assess feasibility and confirm requirements. You receive a final specification and quotation.
Week 2: Deposit Paid & Slot Reserved
Once satisfied, you pay the deposit and secure your installation date, typically 2–4 weeks ahead, depending on the season.
Week 3–4: Materials Ordered & Build Preparation Begins
All components are prepared, from SIP panels to cladding, doors, and internal finishes. Electrical requirements are finalised.
Week 5–6: Installation Takes Place
Our experienced team arrives to complete groundwork and install the structure. Most standard builds take 5–10 working days.
Post-Completion
An electrician returns for testing, final fittings are completed, and all compliance paperwork is issued. Any final snagging is resolved promptly.
When to Order for Summer Use
If your goal is to enjoy your garden room in summer, the best time to place your order is between February and April. This allows for site surveys, production, and installation to be completed well before summer events or holidays begin. Waiting until June or July to order can mean you're looking at an August or September installation—just as the season is winding down.
Can Lead Times Be Shorter?
Yes, occasionally. During quieter months or if a cancellation arises, we may offer earlier installation slots. If you're flexible on dates or design options, let us know—we’ll do our best to accommodate you. However, we never cut corners to squeeze in more builds. Our reputation is built on quality, not quantity.
Should You Book in Advance?
Absolutely. Booking in advance allows you to:
-
Secure your ideal build date
-
Take advantage of current pricing before seasonal rises
-
Spread out decisions like furniture, utilities, and landscaping
-
Prepare the site in your own time (e.g., clearing shrubs, removing sheds)
Advance bookings are especially recommended for garden rooms intended for business use, such as salons or therapy rooms, where deadlines matter more.
The Value of a Site Survey Before Payment
One of the key differentiators at Oeco Garden Rooms is that we do not ask for a deposit until your site survey has been completed. This approach benefits you in several ways:
-
Removes financial pressure while you’re still deciding
-
Ensures no unexpected costs from access or groundwork issues
-
Allows us to tailor a solution with full technical knowledge of your space
-
Shows we’re confident in our service and not simply chasing orders
It’s one of the reasons our clients trust us—our process is transparent, professional, and built around your peace of mind.
Custom Builds vs Standard Designs
The more custom your design, the longer the lead time may be. For example, a highly bespoke build featuring:
-
Partition walls or multiple rooms
-
Plumbing for kitchens or bathrooms
-
Integrated home automation or AV systems
-
Extensive glazing or bifold doors
will typically require additional planning, production, and installation days. While still achievable within 6–8 weeks, these projects benefit from early planning and clear timelines. Standard builds with fixed specifications can often proceed more quickly.
Lead Times and Permitted Development
Most garden rooms we build are designed to fall under permitted development rules, avoiding the need for planning permission. This keeps the lead time to a minimum. However, if you’re in a conservation area, AONB, or planning something unusual (like a home business), lead times can extend to accommodate formal applications. In such cases, we’ll advise you early, assist with paperwork if needed, and keep your slot pencilled in so you’re not delayed once approval is granted.
Customer Expectations and Communication
We believe communication is key. From the moment you enquire, we’ll keep you informed of:
-
Expected site survey date
-
Lead time and provisional build slot
-
Any supplier-related material delays
-
Final confirmation once the slot is booked
Our admin team and site coordinators work closely with you to minimise surprises and ensure the build progresses smoothly.
Final Thoughts: Quality is Worth the Wait
When it comes to a luxury garden room, speed should never come at the cost of quality. A well-built structure can last 30+ years, so waiting 4–6 weeks to ensure it’s constructed properly is a worthwhile investment. At Oeco Garden Rooms, we balance efficiency with attention to detail, ensuring your project is completed on time and to an impeccable standard.
By understanding our lead times—and what affects them—you’ll be better equipped to plan your garden room project with confidence, knowing exactly what to expect, when to expect it, and how we’ll help guide you from enquiry to finished build.